VQEG MM Notes ********************************************************************************************************************************* ********************************************************************************************************************************* Update (since Tokyo mtg, Sept 06): 1) Models now submitted. FS sent out details of submitted models to reflector. 2) Progress on SRCs and preparation of HRCs; at this mtg scene pool content to be distributed MP circulated a proponent test list (17 April). comments received, particularly on unbalanced nature between 30fps and 25fps tests. Some issues with quality of source (e.g. noisy content). Need to be considered here. 3) Question on ILG performing tests in behalf of a proponent 4) Issue regarding who should be on the MMprop reflector ********************************************************************************************************************************* ********************************************************************************************************************************* **MP (13 April) requested info on planned tests from proponents (no. of tests; res/frame rate/impairment type) - replies from Psytechnics, Opticom, [CRC], NTT, KDDI) ********************************************************************************************************************************* ********************************************************************************************************************************* Contributions Contributions relate to: Scene pool (4, 5, 8) Test design (2, 3, 7) Software (6, 8) Test schedule (1) 1) 11 April, Opticom, schedule and timeline --- updated, see item 3 2a) 13 April, CRC, test design (VQEG_CRC-Nortel_Exp_Design.xls) 2b) 17 April, Opticom, updated schedule and timeline (vqeg_mm_testplan_overview_adapted.pdf) 3) 17 April, NTIA, proponent and ILG testing plans (Proponent Tests.doc) 4a) 18 April, NTIA, scene poools (Official MM Scene Pools.doc), content made available to props/ILG 4b) 25 April, NTIA, updated scene pools 5) 1 May, Psytechnics, problems with scene pool content (Psytechnics_Issues_with_some_SRCs_in_the_Official_MM_Scene_Pools.pdf) 6) 2 May, Psytechnics, feedback on test software (Psytechnics_subjective_test_software.pdf) 7) 2 May, Psytechnics, subjective test design proposal (Psytechnics_subjective_test_designs.pdf) 8) 4 May, Opticom, c0mments on scene pool (opticom_comments_on_mm_scene_pool.doc) ********************************************************************************************************************************* ********************************************************************************************************************************* This meeting: i) review SRc scene-pool material, discuss issues and contributions received ii) review test designs (were to be sent to MP, VB, FS) and contributions received iii) software status update, consider received contributions iv) review test schedule with actions - currently behind schedule, but not seriously, one contribution received ********************************************************************************************************************************* *********************************************************************************************************************************